BestCoaltar EP720
Chemical resistance epoxy-resin-coal combination coating, two components, solvent based.
Advantages:
-
Solidify protect, effective water proof under action of erosion agent, corrosion, …
-
High stability under action of seawater, microbe,..
-
Impact resistance, no tear, mechanic abrasion resistance.
-
Well binding strenght, high adhesion, no blister.
-
Easy to construct by simple instrument such as reel, brush, injector,..
-
Construction time is long to avoid wasting material
Download document
EN VN
-
BestCoaltar EP720 is a protective and waterproof coating, durable, tear resistant,
chemical and erosion resistance, effective protection for concrete and steel
structures. BestCoaltar EP720 is a two-component compound made from special
epoxy resin combined with refined coal tar and inert silicate based aggregate.
BestCoaltar EP720 conforms to BS 5493: KF 3 B.
BestCoaltar EP720 is applied as a protective and waterproof coating for both
internal and external surfaces of concrete, steel structures in the ground or in
constant contact with water, chemicals, waste ... such as:
-
Waste water treatment system, industrial waste, domestic waste such as
ditches, sewers, tanks, treatment tanks ...
- Structure of foundations, beams, basements in areas of high corrosion due to chemicals, seawater or sulphate erosion.
-
Hydraulic steel structures are constantly in contact with strong corrosion
agents.
-
Chemical industry, jetty, coastal construction works ...
-
BestCoaltar EP720 is not suitable for places in direct contact with drinking
water, food, domestic animals ...
-
Solidify protect, effective water proof under action of erosion agent, corrosion, …
-
High stability under action of seawater, microbe,..
-
Impact resistance, no tear, mechanic abrasion resistance.
-
Well binding strenght, high adhesion, no blister.
-
Easy to construct by simple instrument such as reel, brush, injector,..
-
Construction time is long to avoid wasting material
Appearance/Color:
|
A: Viscous liquid, black, B: Light yellow liquid or |
Density Mass:
|
A: 1.36 ± 0.02 kg/liter (25oC)
B: 0.90± 0.02 kg/liter (25oC) A+B: 1.23 ± 0.02 kg/liter (25oC) |
Construction temperature:
|
Ambient temperature: 15
oC ÷ 40oC Max
relative humidity of air: 80% |
Consumption density:
|
0.3 ÷ 0.4 kg/m2 /layer (depend on surface status). Should apply two to three layers. |
Mixing ratio:
|
Part A: Part B= 4/1 (by weight)
|
Construction time:
|
8 hours after mixing.
|
Dry surface time:
|
9 hours after construction.
|
Start/finish hardening:
|
10 hours after mixing/ 10 days after constructing (depending on
the thick of the coating)
|
Chemical resistance:
|
BestCoaltar EP720 is resistant to water, seawater, detergents,
diluted acids and alkalis, neutral salts, grease, fuels and many other
chemicals. Without algae and microorganisms sticking.
Not stable under prolonged contact with phenols, oxidizing acids, and
hydrocarbon chloride.
|
Mechanic stability:
|
No tear, impact and mechanic abrasion resistance.
|
Preserve: |
In cool, dry place (5oC ÷ 30 oC)
|
Shelf - life:
|
12 months from the date
|
Đóng gói: |
25 kg/set.
|
Instruction of construction:
Surface
preparation:
-
The concrete or metal surface has to be completely dry, andsolid without any
grease, dirt, moss, mold, etc. The bad adhesion or old material must be completely
removed.
-
Concrete surface: Compressive strength:
≥
20 MPa, Tensile strength:
≥
1.5 MPa.
The surface has to be flat, solid, and dry, maximum moisture is 4% ( if BestPrimer
EP703 is not used).
-
For strong absorbent concrete surfaces or high gloss steel surfaces, must apply
BestPrimer EP701 before applying BestCoaltar EP720.
Mixing:
-
Use an electric mixer or slow-speed pneumatic (400 ÷ 500 cycles/min) to mix
Component A well before pouring all the Component B into Component A.
Continue mixing really well and control the mixing paddle up and down several
times to turn the mixture until homogeneous (Mixing time 3 ÷
5 min).
- When applying the first coat on the concrete surface, dilute by about 3 to 5% Thinner
SC-01 (by weight) in order to increase penetration into the material surface.
Construction:
-
Use a brush, short-spike roller, or pressure nozzle to evenly distribute the mixture
over the entire surface.
- When applying the second layer, it should be perpendicular to the first layer.
-
The pending time for the next two coats can be 24 hours to 3 days, depending on the
environment’s condition and the temperature, it’s advised to monitor the status of the
actual curing time of materials to decide when will be the next appropriate coat.
-
Within 24 hours from the time of application, the surface must avoid direct contact
with rainwater or any mechanical force.
Cleaning:
-
Use a dry cloth or soft paper to clean equipment, and instruments before using
Thinner SC01 to wash finally.
Safety:
- Two components are dangerous, flammable, and allergic when contacting directly to the skin.
-
PPEs must be worn. If gushing out eyes, noses, and mouth, must be washed with
fresh water before taking to the nearest hospital.
-
Should ventilate the construction area with a ventilation fan.
-
Unconditional, NO place product or constructing area contact directly to flame or
heat genetic source.
-
Pouring residual products in regulation place of local government to ensure no
effect on the environment.